You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 41 Next »

Planned deadlines

MilestonePlanned deadlineActual deadlineDescription of the MilestoneComments
M0

 

date as really committed
  • Declaration of participation in the simultaneous release
  • The initial version of Increment Blueprint presented, discussed and approved by TSC
  • Blueprint proposal represented as a Jira EPIC ticket
  • Release Scope Overview updated accordingly, agreed, approved by TSC
  • The initial version of the Release Plan for the project presented
  • Dependencies between projects/components/areas identified
  • Participating projects and initial Release scope approved by TSC 

 

  • Not all Tech Leaders pointed by Juniper are registered on Tungsten Fabric (lack of login, contact)
  • Description of blueprints not available for TF (links refer to Juniper side)

 

  • Features leaders not registerd in LF/Jira
  • Blueprint approval process not agreed
  • Blueprint template not agreed

 

  • Features leaders not registerd in LF/Jira
  • Blueprint approval process not agreed - rework, approvers still needed
  • Blueprint template agreed, but moved rather to  tf-specs  repo
M1

 


  • All dependencies between projects discussed and agreed
  • Jira Epic ticket broken down into stories (backlog, plan) - presented and discussed on TWS meeting
  • The final version of Blueprints, Release Scope and Release Plans for participating projects discussed and approved by TSC

M2

 


  • Technical design fully provided, agreed (documentation on the Confluence available)
  • Documentation started
  • Feature tests started
  • Feature/Functionality Freeze - Technical Design approved by TSC(?)

M3

 


  • External API available for beta-tests
  • Documentation in progress
  • Tests in progress
  • API Freeze
Critical - must be aligned with Juniper timeline
M4

 


  • all functionality and APIs available for testing
  • Code freeze - only bug fixing allowed

RC0

 


  • Release candidates agreed, approved, tested
  • release branch cut off - branch stabilization from now on
  • Release Candidates freeze


Planned scope (current state based on Jira assignment to FixVersion R2011)

Release board - https://jira.tungsten.io/secure/RapidBoard.jspa?rapidView=5&projectKey=TFF

key summary type created updated assignee status resolution

Unable to locate Jira server for this macro. It may be due to Application Link configuration.



Unable to locate Jira server for this macro. It may be due to Application Link configuration.

The initial list of blueprints/features (from Juniper - as a reference)


Feature nameFeature LeadModules (Components)

Approvers
(from Modules Committers)

BluePrint Specification links
1.

Example: TFF-1 Provision for a knob (per service chain) to prevent reset of AS_PATH and maintain it through a service chain

Provision for a knob (per service chain) to prevent reset of AS_PATH and maintain it through a service chain

  • Configuration System
  • Control Plane (Control Node)

Blueprint

https://review.opencontrail.org/c/tungstenfabric/tf-specs/+/60825

2.Collapsed Spine L2/3 fabricVajrapu Venkata Rama Pradeep Kumar 
  • Fabric Management (Device Configuration,Fabric Underlay)
Blueprint
3.Ubuntu 20.04 Support
  • Deployment (Juju)

Unable to locate Jira server for this macro. It may be due to Application Link configuration.

4.Charmed OpenStack Ussuri Support

Anastasia Kravets 

  • Deployment (Juju)
https://contrail-jws.atlassian.net/browse/CEM-18370
5.Data Plane Mac/IP Learning Mode for vRouterSivakumar Ganapathy 
  • Control Plane (Control Node, vrouter Agent)


Blueprint
6.Combined FFU+ZIU upgrade from RHOSP13/CN19xx to RHOSP16.1/CN R2011 LTS
  • Deployment (RHOSP)
https://contrail-jws.atlassian.net/browse/CEM-18405
7.Optimize the workflow for LR in ERB Mode when creating IRB in the FabricVajrapu Venkata Rama Pradeep Kumar
  • Fabric Management (Overlay)
Blueprint
8.Contrail-2003/TCS P0: EVPN Type5 LR : Specific remote VN routes into added to the tenant VN and not the default route

Harsh Kumar 

  • Control Plane (vrouter Agent)
Blueprint
9.BFD/BGP sessions flapping on two computes

Narendranath Karjala

  • Control Plane (vrouter Agent)
CEM-16291-DesignDoc
10.Qualify 5220 (EVO-based) as a lean spine in ERB fabricSahana Sekhar P C
  • Fabric Management (Device Management, Overlay, Underlay)
https://contrail-jws.atlassian.net/browse/CEM-16301
11.DCI -EVPN using L2/3 DCI OTT - Phase 0

Parag Sanghvi

  • Configuration System (API Server)
  • Fabric Management (Device Manager Infrastructure, Device Configuration, Overlay, Underlay)
https://review.opencontrail.org/c/tungstenfabric/tf-specs/+/60781
12.CaVA - Join to clusterTomasz Nowak
  • Deployment (OVA)
  • Operator Framework
https://docs.google.com/document/d/1amNES5_scjPHe6gpSt8mBUCfBh1O25LCK7yXsNxIwls/edit?usp=sharing
13.Fabric scale and performance as per PLM requests for R2011
  • Fabric Management (Overlay)
Blue Print
14.3-tier/5-stage fabric - support for single-plane superspine design (based on 'lean leaf' workaround today)

Abhinav Pandit

  • Configuration System (API Server)
  • Fabric Management (Device Manager Infrastructure, Device Configuration)
https://review.opencontrail.org/c/tungstenfabric/tf-specs/+/60791/1/R2011/cem-5002-super-spine-support.md
16TF Operator Framework
  • Operator Framework
TF Operator Framework
16RBAC support for fabricConfig , UI https://review.opencontrail.org/c/tungstenfabric/tf-specs/+/60724






  • No labels